RAMS is one of the most common terms in construction and higher-risk work, but it’s often used loosely. Here’s what it actually means and when you’re likely to need it.
What RAMS Stands For
RAMS stands for Risk Assessment and Method Statement. It usually refers to a combined document made up of two parts: a risk assessment and a method statement.
The Difference Between the Two
- Risk assessment: identifies the hazards involved in a task and the control measures needed to manage them.
- Method statement: sets out, step by step, how the work will actually be carried out safely.
When RAMS Are Typically Requested
RAMS are commonly requested for construction and other higher-risk work, often by clients or principal contractors before work is allowed to start on site. They are closely tied to the Construction (Design and Management) Regulations 2015 (CDM 2015), which expect those carrying out work to plan and manage health and safety risks.
What Good RAMS Look Like
RAMS that are genuinely useful are specific to the task, site and people involved, not copied from a previous job. They should be communicated to everyone carrying out the work, not just filed away once they’ve been approved.